St. Luke's Surigcenter Code Review
University of Missouri Columbia, Operating Rooms
Menorah Hospital - Pharmacy
Elite Sports Medicine
Overland Park Regional Medical Center Pharmacy Box
Replacement
Overland Park Health Care - Pharmacy
Sutherland Institute Remodel
Truman Medical Center Lakewood
Teaching Hospital, Operating Room Electrical Power
Truman Medical Center Hospital Hill
Higginsville Senior Center - Phase II
Deer Creek Surgery Center
Goldstein Dermatology & Skin Care Center
Pain Clinic
Deer Creek Surgery Center
Deer Creek Surgery Center
Deer Creek Surgery Center
Goldstein Dermatology & Skin Care Center
Ellett Memorial Hospital
Appleton City, Missouri

Bredson + Associates, Inc. engineering design responsibility was for the Mechanical, Electrical,
Plumbing, and Fire Protection systems for a new 8,440 sq ft addition, 14,260 sq ft renovation,
12 bed community hospital.

The heating, ventilating, and air conditioning system is all electrical heating and DX cooling
controlled by an energy management system. Electrical distribution is a 277/480 Volts, three
phase, 4 wire system for lighting and motors 3/4 HP and larger and a 120/208 Volts, three
phase, 4 wire system utilizing step down transformers for general receptacles and small
equipment loads. An emergency generator provides power for the life safety, critical, and
equipment systems in the hospital. Medical gas systems, oxygen, vacuum, medical air and
nitrous, are piped throughout the hospital. The hospital is provided with a fully automatic
sprinkler system and an addressable fire alarm annunciation and detection system. The
following auxiliary systems are installed in the hospital: nurse call, public address, medical gas
alarm, and raceway for telephone, data and security.

Scheduled Completion: Spring 2008
Other Healthcare Facility Projects: