|
|





St. Luke's Surigcenter Code Review |
University of Missouri Columbia, Operating Rooms |
Menorah Hospital - Pharmacy |
Elite Sports Medicine |
Overland Park Regional Medical Center Pharmacy Box Replacement |
Overland Park Health Care - Pharmacy |
Sutherland Institute Remodel |
Truman Medical Center Lakewood |
Teaching Hospital, Operating Room Electrical Power |
Truman Medical Center Hospital Hill |
Higginsville Senior Center - Phase II |
Deer Creek Surgery Center |
Goldstein Dermatology & Skin Care Center |
Pain Clinic |

Iron County Regional Hospital Pilot Knob, Missouri Bredson + Associates, Inc. engineering design responsibility was for the Mechanical, Electrical, Plumbing, and Fire Protection systems for a new 8,440 sq ft addition, 14,260 sq ft renovation, 12 bed community hospital. The heating, ventilating, and air conditioning system is all electrical heating and DX cooling controlled by an energy management system. Electrical distribution is a 277/480 Volts, three phase, 4 wire system for lighting and motors 3/4 HP and larger and a 120/208 Volts, three phase, 4 wire system utilizing step down transformers for general receptacles and small equipment loads. An emergency generator provides power for the life safety, critical, and equipment systems in the hospital. Medical gas systems, oxygen, vacuum, medical air and nitrous, are piped throughout the hospital. The hospital is provided with a fully automatic sprinkler system and an addressable fire alarm annunciation and detection system. The following auxiliary systems are installed in the hospital: nurse call, public address, medical gas alarm, and raceway for telephone, data and security. Scheduled Completion: Spring 2008 |
Other Healthcare Facility Projects: |