St. Luke's Surigcenter Code Review
University of Missouri Columbia, Operating Rooms
Menorah Hospital - Pharmacy
Elite Sports Medicine
Overland Park Regional Medical Center Pharmacy Box
Replacement
Overland Park Health Care - Pharmacy
Sutherland Institute Remodel
Truman Medical Center Lakewood
Teaching Hospital, Operating Room Electrical Power
Truman Medical Center Hospital Hill
Higginsville Senior Center - Phase II
Deer Creek Surgery Center
Goldstein Dermatology & Skin Care Center
Pain Clinic
Deer Creek Surgery Center
Deer Creek Surgery Center
Deer Creek Surgery Center
Goldstein Dermatology & Skin Care Center
Sayre Community Hospital
Sayre, Oklahoma

Bredson + Associates, Inc. engineering design responsibility was for the Mechanical, Electrical,
Plumbing, and Fire Protection systems for a new 35,188 sq ft, 35 bed community hospital, a
6,275 sq ft, 6 bed psychiatric unit and a 9,316 sq ft clinic.

The heating, ventilating, and air conditioning system is roof top units with gas heating and
electric chilled water-cooling controlled by an energy management system. Electrical distribution
is a 277/480 Volts, three phase, 4 wire system for lighting and motors 3/4 HP and larger and a
120/208 Volts, three phase, 4 wire system utilizing step down transformers for general
receptacles and small equipment loads. An emergency generator provides power for the life
safety, critical, and equipment systems in the hospital. Medical gas systems, oxygen, vacuum,
medical air and nitrous, are piped throughout the hospital. The hospital is provided with a fully
automatic sprinkler system and an addressable fire alarm annunciation and detection system.
The following auxiliary systems are installed in the hospital: nurse call, public address, medical
gas alarm, and raceway for telephone, data and security.

Scheduled Completion: Spring 2008
Other Healthcare Facility Projects: